SPLIT UNIT AIR CONDITIONING TRAINER
DESCRIPTION
The machine is designed for simplifying learning of vapor compression Air conditioning system. The system is constructed from commonly available split unit air-conditioning unit and with modification to make learning easier.
ACCESSORIES :
Accessories including:
i. Copper tube 3 unit ( follow the type of air Cond)
ii. Flare nut wrench set ( hexagonal wrench & Torque wrench)
iii. 275-FS Flaring & Swaging tool set for 1/8” to ¾” ( 4mm to 22 mm)
iv. Gas leak detector
v. Gas R22
vi. Manifold gauge set R22
vii. Level gauge
viii. Cutter tube
ix. Allen Key
x. Alat pembengkok paip tembaga
xi. Insulation piping Air conditioning
xii. 4CFM Air conditional vacuum pump
xiii. Measuring tape
xiv. Thermometer digital
xv. Mega meter
xvi. Thermocouple vacuum gauge
xvii. Reamer
xviii. Knife
xix. Copper Pipe Cutter
xx. Silinder sevis yang kosong
xxi. Silinder penyimpan bahan pendingin
xxii. Clamp meter
xxiii. File
xxiv. Tool box Set for Installation & Maintenance
POWER REQUIREMENTS :
Power supply: 240 V, 47 - 62 Hz
EXPERIMENT :
· Installation Air-conditioning
· Testing electrical component in Air conditioning
· Servicing of refrigeration system – vacuum
· Leakage Test
· Material Handling Air-the transfer of refrigerant
· Servicing of refrigeration systems – Refueling coolant
· Servicing of refrigeration systems – the charging of refrigerant
· Servicing of refrigeration systems – Pump down
· Troubleshooting guide unit
WARRANTY :
At least 1 year inclusive of parts and labor /after sales service from the date of successful completion of Installation and commissioning and handling over.
i. Each unit can be easily opened and installed on the panel for the installation and maintenance of practical training as in lab sheet
ii. These devices be equipped with distribution board containing switches Fuse, MCB and RCCB type of one phase.
iii. These devices be equipped with circuit control panel DOL starter.
iv. Suppliers are encouraged to design their own to suit the practical
v. Sketches are as follows. Suppliers do not necessarily follow this sketch.