Categories
  • MZM-1000 Home Building Automation
  • MZM-2000 Mechatronics
  • MZM-3000 Electronic Engineering
  • MZM-4000 Electrical Engineering
  • MZM-5000 New & Renewable Energy
  • MZM-6000 Pneumatic,Hydraulic & Fluid Mechanics
  • MZM-8000 Automotive
  • MZM-9000 Test & Measurement
  • MZM-10000 Industrial Equipment
    • - ADHESIVE TAPE CARTON SEALING MACHINE
    • - AUTOMATIC STRAPPING MACHINE SERIES
    • - BAND SEALER
    • - BS SERIES AUTOMATIC SHRINKING MACHINE
    • - COLOURED-TAPE PRINTER
    • - CONTINUOUS BAND SEALER
    • - CONVEYOR
    • - DRIP COFFEE PACKING MACHINE
    • - EXTERNAL VACUUM PUMP
    • - GENERAL PACKING MACHINE SERIES
    • - HIGH SPEED PACKING MACHINE SERIES
    • - MANUAL / PEDAL SEALER
    • - MULTI_FUNCTIONAL FILM SEALER
    • - OIL ROTARY VANE VACUUM PUMP
    • - SEMI-AUTO SEALING CUTTING MACHINE
    • - SEMI-AUTOMATIC STRAPPING MACHINE SERIES
    • - SEMI-AUTOMATIC VACUUM PACKAGER
    • - SOLID-INKER PRINTER FILM SEALER
    • - TEABAG PACKING MACHINE SERIES
  • Home
  • SPLIT UNIT AIR CONDITIONING TRAINER

SPLIT UNIT AIR CONDITIONING TRAINER

SPLIT UNIT AIR CONDITIONING TRAINER
Click image for Gallery
SPLIT UNIT AIR CONDITIONING TRAINER
Product Code: MZM - 1009
Availability: In Stock
  - OR -  
Add to Wish List
Add to Compare
Tags:
Description

DESCRIPTION

The machine is designed for simplifying learning of vapor compression Air conditioning system. The system is constructed from commonly available split unit air-conditioning unit and with modification to make learning easier.

 

ACCESSORIES :

Accessories including:

i.  Copper tube 3 unit ( follow the type of air Cond)

ii. Flare nut wrench set ( hexagonal wrench & Torque wrench)

iii. 275-FS Flaring & Swaging tool set for 1/8” to ¾” ( 4mm to 22 mm)

iv.  Gas leak detector

v.  Gas R22

vi.  Manifold gauge set R22

vii.  Level gauge

viii.  Cutter tube

ix.  Allen Key

x.  Alat pembengkok paip tembaga

xi.  Insulation piping Air conditioning

xii. 4CFM Air conditional vacuum pump

xiii.  Measuring tape

xiv.  Thermometer digital

xv.  Mega meter

xvi.  Thermocouple vacuum gauge

xvii.  Reamer

xviii.  Knife

xix.  Copper Pipe Cutter

xx.  Silinder sevis yang kosong

xxi.  Silinder penyimpan bahan pendingin

xxii.  Clamp meter

xxiii. File

xxiv. Tool box  Set for Installation & Maintenance

 

POWER REQUIREMENTS :

Power supply: 240 V, 47 - 62 Hz

 

EXPERIMENT  :

· Installation Air-conditioning

· Testing electrical component in Air conditioning

· Servicing of refrigeration system – vacuum

· Leakage Test

· Material Handling Air-the transfer of refrigerant

· Servicing of refrigeration systems – Refueling coolant

· Servicing of refrigeration systems – the charging of refrigerant

· Servicing of refrigeration systems – Pump down

· Troubleshooting guide unit

 

WARRANTY :

 At least 1 year inclusive of parts and labor /after sales service from the date of   successful completion of Installation and commissioning and handling over.

i.  Each unit can be easily opened and installed on the panel for the installation and maintenance of practical training as in lab sheet

ii. These devices  be equipped with distribution board containing switches Fuse, MCB and RCCB type of one phase.

iii. These devices  be equipped with circuit control panel DOL starter.

iv.  Suppliers are encouraged to design their own  to suit the practical

v. Sketches are as follows. Suppliers do not necessarily follow this sketch.

Send Enquiry

Your Name
Your Email
Tele Phone

Captcha

Submit